Product introduction

ZTT226C Intelligent Construction Crane

1.ZTT226C Intelligent Construction Crane 1

● Max lifting capacity : 10Ton

● Tip load: 2.0Ton

● Jib length: 70M

● Free standing height: 60M

● Mast section: L68B1/L68B3(2*2*3m)

Each mast section is equipped with an inclined ladder and rest platform

 

1.ZTT226C Intelligent Construction Crane 2

 

ZTM Tower Crane Intelligent Mechanism

High-performance hoisting winch long-term heavy-load and stable operation, increasing the lifting efficiency by 10-20% with load and speed.

High-speed luffing winch with load and speed,fast response, work efficiency increased by 20%.

Slewing mechanism-slewing runs smoothly,without fear of wind interference, intelligently controlled 0-50Hz acceleration time 8s.

Users can choose SEW and FLENDER as upgrade configurations, which are used in hoisting and luffing winch.

 

Equipped with a human-computer interaction system, through the centralized control of the three major institutions, the equipment status can be quickly obtained.

The tower crane operator can grasp the operating status of the whole machine in real time to ensure the safer use of the tower crane and improve the user experience.

2.ZTM Tower Crane Intelligent Mechanism 2

 

Tower crane details

3.Tower crane details

 

Tower crane steel structure

4.Tower crane steel structure 1

 

Telescopic cage Mast section Fixing angle

4.Tower crane steel structure 2

Boom Slewing table Collar frame Transition section

 

Luxury integrated cab

5.Luxury integrated cab

 

ZTM Automated production line

6.ZTM Automated production line

 

ZTM overseas project case

7.ZTM overseas project case

Company Video

We welcome customers at home and abroad to visit our factory to reach long-term cooperation and create success together.

视频标题

FAQ

What is the main use of a tower crane?


Tower cranes are mainly used in high-rise construction, especially when there is a need to vertically lift heavy loads or large components. They provide an efficient lifting solution on construction sites.

What is the working principle of a tower crane?


A tower crane operates with a rotating mast and jib. It lifts heavy objects using a hook powered by an electric motor, with steel cables that carry the load during lifting operations.

What are the main safety measures for tower cranes?


Safety measures for tower cranes include regular inspections and maintenance, operator training, overload prevention systems, and the installation of limit devices.

What is the lifting capacity of a tower crane?


The lifting capacity of a tower crane depends on the model and configuration, typically ranging from several tons to several hundred tons.

Are tower cranes suitable for all construction projects?


Tower cranes are primarily used for high-rise buildings and large-scale construction projects. They may not be suitable for low-rise buildings or smaller projects.

What is the typical rental cost for a tower crane?


The rental cost of a tower crane varies depending on the crane's specifications, rental duration, and location, typically ranging from several thousand to tens of thousands of RMB.

ZTT226 Flattop Tower Crane 10t Capacity 70m Jib Length 2t Tip Load With Inclined Ladder

Product Model:

High-performance hoisting winch long-term heavy-load and stable operation, increasing the lifting efficiency by 10-20% with load and speed. High-speed luffing winch with load and speed,fast response, work efficiency increased by 20%.
  • Commodity name: ZTT226 Flattop Tower Crane 10t Capacity 70m Jib Length 2t Tip Load With Inclined Ladder

Online Message

Ready to grow your business? Your next great business opportunity starts with an inquiry.


Send Inquiry Now