ZTL286 14ton luffing crane detailed introduction
ZTL286(5522) self erecting luffing crane, is one of our new model of frequency control of motor speed of tower crane.
1. Max. load: 14t
2. Jib length: 55m
3. Tip load: 2.2t
4. Free standing height: 51.2m
5. Mast section: L68B2 (2.0*2.0*3.0m)
6.Type: stationary, inner-climbing
14ton luffing boom crane technical parameter
Model |
ZTL286 |
Country Standard |
|
Power Frequency |
50Hz |
Power Voltage |
380V |
Free Standing Height |
51.2m |
Max Jib Length |
55m |
Max Lifting Capacity |
14T |
The Max Height under Hook |
107.95m |
Tip Load at Max Jib Length |
2.2T |
Working Speed |
|
The Power of Hoisting Mechanism |
55kW |
The Power of Luffing Mechanism |
45kW |
The Power of Slewing Mechanism |
2x5.5kW |
The Speed of Hoisting Mechanism |
4.2-80r/min |
The Speed of Luffing Mechanism |
15°-85° 2.2min |
The Speed of Slewing Mechanism |
0-0.7r/min |
Loading capacity of 14ton luffing jib crane
ZTL286 14T luffing jib crane characteristics
User-friendly structure design
The raw materials used by the ZTM tower crane are steel from China's top steel mills. The standard section is equipped with inclined ladders and hot-dip galvanized resting platforms every 3 meters to ensure the safety of construction personnel.
Automatic parameter adaptation
This feature ensures that the inverter can run at the best performance at any time and under any working conditions, and there will be no mismatches due to changes in the lifting characteristics of the motor caused by the long-term operation of the motor.
Load/speed adaptive system
The maximum operating speed can be automatically adjusted according to the weight of the hoisted object to achieve the effect of light load high speed and heavy load slow speed, and the speed will change according to the change of load.
To avoid the lifting mechanism running to high speed when the tower crane operator is overloaded, to ensure the safe and reliable operation of the system.
Tower group anti-collision technology
The tower crane anti-collision system can track the position of the hook in real time, monitor, record, and save the video of the surrounding environment of the hook, so that the tower can clearly see the surrounding environment of the hook, avoid safety accidents, and improve work efficiency.
Tower crane Intelligent manufacturing process
Luffing crane various parts
The control system is inside the tower crane cab