ZTL346 18T luffing tower crane overview
ZTL346(6024)luffing crane is equipped with multiple safety systems to provide maximum driving comfort and safest operation. The hoisting winch can perfectly control the luffing and descending moment on the cantilever. The high performance of the slewing mechanism will meet your control requirements for acceleration and low-speed accuracy in all slewing movements of the boom
1. Maximum load: 18t
2. Jib length: 60m
3. Tip load: 2.4ton
4. Independent height: 58.1m
5. Mast section: L68B3 (2.0*2.0*3.0m)
6. Type: fixed, internal climbing, walking tower crane
18ton luffing crane technical parameters
Mechanism |
2Fall |
4Fall |
Drum capacity |
Motor |
||||
m/min |
t |
m/min |
t |
KW |
||||
Hoisting |
18T |
100LVF45L |
0-38 |
9.0 |
0-19 |
18.0 |
550m |
75 |
Luffing |
120DVF60L |
15°-85° 3.0min |
90 |
|||||
Slewing |
RCV |
0-0.7rpm |
2*145N.m |
|||||
Travelling |
RT |
12.5-25 m/min |
4x2.6/5.2 |
|||||
Pressure |
KVA |
380V(±10%) 50HZ |
100LVF45L: 240 75LVF30L: 212 |
18t luffing boom tower crane load diagram
18ton luffing crane outstanding features
The electrical control system of the tower crane adopts the current advanced "PLC" control method, which greatly improves the reliability, operability and stability of the control system and the working efficiency of the tower crane.
The tower crane is equipped with various reliable safety devices such as the lifting height limiter, the slewing range limiter and the multi-function limiter to control the load torque, the lifting capacity and the traveling range of the trolley. Its PLC (programmable logic controller) unit can diagnose the cause of the failure.
The use of world-renowned electrical components such as ABB, Schneider (TE), and Yaskawa greatly reduces the failure rate of the electronic control system and improves work efficiency.
In addition, there are electrical safety devices such as anemometers, obstruction lights, and mechanical safety devices to prevent the trolley axles and wire ropes from breaking.
ZTL346 18ton luffing crane main parts
Main production process
Packaging and shipping
FAQ
1.Minimum Order Quantity?
MOQ is One Set.
2.What kind of terms of payment?
T/T,L/C,D/A,D/P,Western Union are available.
3.How long does it usually take to deliver the product?
The production period is 20 days to 45 days,We'll make the shipment to you soon.Accurate delivery time depends on the specific quantity.
4.Quotation request:
If you are interested in our products,please provide the following parameters:
1)Jib Span/Jib Length(m)
2)Max load capacity(ton)
3)Tip load capacity(ton)
4)Lifting height(m)
5)Local power supply(kw,hz)
We will provide best price once confirmed the above.