Tower Crane Data Management
2024-01-31
The construction company or the tower crane owner should submit the tower crane’s production license, product qualification certificate, disassembly and assembly license, instruction manual, electrical schematic diagram, hydraulic system diagram, driver’s operating license, tower crane foundation diagram, geological survey data, tower crane The machine disassembly and assembly plan, safety technical disclosure, and the main parts warranty (wire rope, high-strength connecting bolts, anchor bolts and main electrical components, etc.) are reported to the tower crane inspection center. After the tower crane inspection center passes the test, the safe use certificate will be obtained , And the handover record with the project manager department after installation. At the same time, it is necessary to strengthen the dynamic tracking management of the tower crane in daily use, and make a record of the shift, inspection and maintenance (including minor repairs, medium repairs, and major repairs) and With the signature of the relevant responsible person, the materials and wearing parts replaced during the maintenance process must have a certificate or quality assurance certificate, and the above-mentioned materials should be sorted and filed in time, and a machine account should be established.
Keywords:
Related news
2024-02-04
2024-02-04
2024-02-04