Construction lifting platform (single mast)
Building construction lifting aerial working platform
Model NO. :SCP230/9D
Specification :24*1.5m
Materials: Steel or Steel Galvanized
Driven Type:AC
Power Supply: 380V/50Hz
Lifting platform application
The construction lifting platform (mast climbing work platform) is suitable for the construction of glass wall and the installation and fixation of external wall, especially suitable for ceiling installation of wire and pipe. To some extent, it can replace high - altitude work basket and scaffolding.It can be widely used in high-rise building exterior wall decoration, glass curtain wall construction, exterior wall and glass cleaning.
Construction lifting platform image
Construction material hoist characteristic
Length and width can be changed according to need.
Overload device and safety device included.
With the manual landing system which allow to drive down the platform manually while electric power off.
Building lifting platform technical data
Name |
Unit |
Parameter |
Max length(Single mast) |
m |
10.5 |
Standard width |
m |
1.5 |
Payload capacity |
Kg |
2300 |
Max. load of person number |
3 |
|
Lifting Speed |
m/min |
5 |
Max. lifting height(with tie-in) |
m |
150 |
Max hanging height |
m |
3 |
Interval between two tie-in |
m |
3~6 |
Power supply |
380V/50Hz/3Phase |
|
Motor power |
KW |
2*3, NORD |
Mast section type |
m |
0.65*0.65*1.508 |
Freq. control (Optional) |
KW |
7.5, Siemens |
We adhere to the principle of safety and quality first, to provide customers with safe and reliable products.
Cargo lift platform main parts
Workshop Production Equipment
Related Products
Packaging and shipping