Send Message
Jiangxi Zhongtian Intelligent Equipment Co., Ltd. ronan@ztmchina.com
154HC Tower Crane Fixing Angle

154HC Tower Crane Fixing Angle

  • High Light

    154HC Tower Crane Fixing Angle

    ,

    ZTM Tower Crane Fixing Angle

    ,

    CE fixing angle tower crane

  • Place of Origin
    CHINA
  • Brand Name
    ZTM
  • Certification
    CE、ISO
  • Price
    Cost-effective
  • Packaging Details
    Well Packed
  • Delivery Time
    10-60 Days

154HC Tower Crane Fixing Angle

Tower crane 154HC Fixing Angle

Tower crane fixing angle is connected between Tower body and concrete foundation. We could provide Liebherr tower crane fixing angle 120HC/132HC/154HC/290HC

 

Model: Liebherr 154HC Fixing Angle

Size: 0.3*0.3*1.34m

Connected by: Bolt

Bolt Size: M36*400mm

Type: Split structure

Material: Q345B

Weight: 580kg

Apply for: Liebherr Tower Crane

Matching mast section size:1.8*1.8*2.5M

 

Photo of liebherr fixing angle 154HC

Laser cutting machine generator_

 

Tower crane foundation leg details

3.Tower crane foundation leg details

 

Tower crane foundation fixing angle features

a. The original steel material comes from China famous steel factory.

b. From cutting, welding, painting, drying till final packing, the standard inspection procedure is set up.

c. Tooling is adopted for the Steel Structure manufacturing, which makes sure that every product is total same with each other.

d. Final penetration detection of ZTM tower crane steel structure is one of the guaranteed of the reliable quality.

 

ZTM tower crane fixing angle

Our factory produce and supply almost all famous brand tower crane spare parts : Mast section, Anchor Frame, Fixing angle ,Adaptor and so on . Provide High quality tower crane Accessories as well as other spare parts of tower crane with good quality, competitive price, short delivery and professional service.

5.ZTM tower crane fixing angle

 

Application of tower crane fixed leg

Tower crane foundation was poured in two stages. A mud slab approximately 1’-0” thick was placed first to provide a stable surface for the tower crane base section to set on. Once the mud slab was cured the tower crane foundation was formed and reinforced, tower crane base section was set, and then foundation was poured;

6.Application of tower crane fixed leg

 

ZTM Company and workshop

7.ZTM Company and workshop

 

 

Loading and shipping

8.Loading and shipping