Product introduction
ZTL346 18T luffing tower crane overview

ZTL346(6024)luffing crane is equipped with multiple safety systems to provide maximum driving comfort and safest operation. The hoisting winch can perfectly control the luffing and descending moment on the cantilever. The high performance of the slewing mechanism will meet your control requirements for acceleration and low-speed accuracy in all slewing movements of the boom.
1. Maximum load: 18t
2. Jib length: 60m
3. Tip load: 2.4ton
4. Independent height: 58.1m
5. Mast section: L68B3 (2.0*2.0*3.0m)
6. Type: fixed, internal climbing, walking tower crane
18ton luffing crane technical parameters
| Mechanism (ZTL346 18T) | 2Fall | 4Fall | Drum capacity | Motor | ||||
| m/min | t | m/min | t | KW | ||||
| Hoisting | 18T | 100LVF45L | 0-38 0-46 0-76 | 9.0 6.0 3.0 | 0-19 0-23 0-38 | 18.0 12.0 6.0 | 550m | 75 |
| Luffing | 120DVF60L | 15°-85° 3.0min | 90 | |||||
| Slewing | RCV | 0-0.7rpm | 2*145N.m | |||||
| Travelling | RT | 12.5-25 m/min | 4x2.6/5.2 | |||||
| Pressure | KVA |
| 380V(±10%) 50HZ | 100LVF45L: 240 75LVF30L: 212 |
18t luffing boom tower crane load diagram
18ton luffing crane outstanding features
The electrical control system of the tower crane adopts the current advanced "PLC" control method, which greatly improves the reliability, operability and stability of the control system and the working efficiency of the tower crane.
The tower crane is equipped with various reliable safety devices such as the lifting height limiter, the slewing range limiter and the multi-function limiter to control the load torque, the lifting capacity and the traveling range of the trolley. Its PLC (programmable logic controller) unit can diagnose the cause of the failure.
The use of world-renowned electrical components such as ABB, Schneider (TE), and Yaskawa greatly reduces the failure rate of the electronic control system and improves work efficiency.
In addition, there are electrical safety devices such as anemometers, obstruction lights, and mechanical safety devices to prevent the trolley axles and wire ropes from breaking.
![]() |
![]() |
ZTL346 18ton luffing crane main parts

Main production process

Packaging and shipping

FAQ
1.Minimum Order Quantity?
MOQ is One Set.
2.What kind of terms of payment?
T/T,L/C,D/A,D/P,Western Union are available.
3.How long does it usually take to deliver the product?
The production period is 20 days to 45 days,We'll make the shipment to you soon.Accurate delivery time depends on the specific quantity.
4.Quotation request:
If you are interested in our products,please provide the following parameters:
1)Jib Span/Jib Length(m)
2)Max load capacity(ton)
3)Tip load capacity(ton)
4)Lifting height(m)
5)Local power supply(kw,hz)
We will provide best price once confirmed the above.
Company Video
We welcome customers at home and abroad to visit our factory to reach long-term cooperation and create success together.
FAQ
What is the main use of a tower crane?
Tower cranes are mainly used in high-rise construction, especially when there is a need to vertically lift heavy loads or large components. They provide an efficient lifting solution on construction sites.
What is the working principle of a tower crane?
A tower crane operates with a rotating mast and jib. It lifts heavy objects using a hook powered by an electric motor, with steel cables that carry the load during lifting operations.
What are the main safety measures for tower cranes?
Safety measures for tower cranes include regular inspections and maintenance, operator training, overload prevention systems, and the installation of limit devices.
What is the lifting capacity of a tower crane?
The lifting capacity of a tower crane depends on the model and configuration, typically ranging from several tons to several hundred tons.
Are tower cranes suitable for all construction projects?
Tower cranes are primarily used for high-rise buildings and large-scale construction projects. They may not be suitable for low-rise buildings or smaller projects.
What is the typical rental cost for a tower crane?
The rental cost of a tower crane varies depending on the crane's specifications, rental duration, and location, typically ranging from several thousand to tens of thousands of RMB.
ZTL346 Luffing Tower Crane 18t Capacity 60m Jib Length 2.4t Tip Load Hoisting Equipment
Product Model:
- Commodity name: ZTL346 Luffing Tower Crane 18t Capacity 60m Jib Length 2.4t Tip Load Hoisting Equipment
- Max. hoisting capacity: 18
- Max. hoisting capacity at jib end: 2.4
- Max. boom length: 60
- Max. free standing height: 58.1
- Max. jib Length: 60
- Tip Load: 2.4
- Independent height (m): 58.1
- Standard section configuration: L68B3
Categories:
RELATED PRODUCTS
Online Message
Ready to grow your business? Your next great business opportunity starts with an inquiry.

