New gantry cranes generally require a running-in period of about 60 hours

2021-11-17

New gantry cranes generally have a running-in period of about 60 hours, which is stipulated by the manufacturing plant according to the technical characteristics of the crane in the initial period of use.
VIEW MORE

Tower crane wall attachment device

2021-11-28

When the tower crane exceeds its independent height, a wall-attached device must be erected to increase the stability of the tower crane.
VIEW MORE

Tower crane electrical safety

2021-11-29

According to the requirements of "Building Construction Safety Inspection Standard" (JGJ59-99), the special switch box of the tower crane must also meet the requirements of "one machine, one gate, one leakage, one box"